Installation of FGD at 3x250 MW units of Parli TPS on EPC basis for Design, Engineering, Manufacture, Assembly, Testing at Works, Supply at Site; Civil, Structural & Architectural Works and Erection, Testing & Commissioning and Operation & Maintenan

Installation of FGD at 3x250 MW units of Parli TPS on EPC basis for Design, Engineering, Manufacture, Assembly, Testing at Works, Supply at Site; Civil, Structural & Architectural Works and Erection, Testing & Commissioning and Operation & Maintenan
File Size:
363.84 kB
Date:
04 November 2020
 
 
 
Powered by Phoca Download