Installation of Dry Sorbent Injection technology FGD system at 8x210 MW units of MAHAGENCO on EPC basis for Design, Engineering, Manufacture, Assembly, Testing at Works, Supply at Site; Civil, Structural & Architectural Works and Erection, Testing &

Installation of Dry Sorbent Injection technology FGD system at 8x210 MW units of MAHAGENCO on EPC basis for Design, Engineering, Manufacture, Assembly, Testing at Works, Supply at Site; Civil, Structural & Architectural Works and Erection, Testing &
File Size:
600.34 kB
Date:
24 February 2021
 
 
 
Powered by Phoca Download