MPCB CONSENT TO OPERATE STATUS

Last updated on मार्च 24th, 2023 at 05:35 pm

Sr.No.Power StationCTO ValidityStatus
1Bhusawal TPS U#3,4,531.12.2023VALID
2Chandrapur STPS31.05.2023VALID
3Koradi TPS 3×660 MW31.12.2023VALID
4Koradi TPS 210 MW31.12.2022VALID
5Khaperkheda TPS31.12.2022VALID
6Parli TPS U#6,731.12.2023VALID
7Parli TPS U#831.12.2023VALID
8Paras TPS31.12.2022VALID
9Nashik TPS31.12.2022VALID
10Uran GTPS31.08.2023VALID

MPCB CONSENT TO ESTABLISH STATUS

Sr.No.Power StationCTE ValidityStatus
1Bhusawal Project 1×660 MW10/06/2025VALID
2Gare Palma Sec-II Coal Mine Project——Under process