Installation of Dry Sorbent Injection technology FGD system at 8×210 MW units of MAHAGENCO on EPC basis for Design, Engineering, Manufacture, Assembly, Testing at Works, Supply at Site; Civil, Structural & Architectural Works and Erection, Testing &

Last updated on April 13th, 2022 at 07:10 am

Installation of Dry Sorbent Injection technology FGD system at 8×210 MW units of MAHAGENCO on EPC basis for Design, Engineering, Manufacture, Assembly, Testing at Works, Supply at Site; Civil, Structural & Architectural Works and Erection, Testing &

Listen