Timeline Extension - Design, Engineering, Supply, Erection, Inspection, Installation, Testing and Commissioning of 100 MWAC Floating Solar PV Plant with 100 MW / 400 MWh BESS, construction of 33/132 kV Pooling Substation, HT overhead transmission line / underground cable, as applicable, and evacuation of power through LILO connection to the existing 132 kV Arvi–Pulgaon D/C Transmission Line, including all associated line bays, transformer bays, switchgear, transformers, transmission towers, conductors, OPGW / communication system, protection, metering, SCADA, PPC, EMS and all other electrical and transmission infrastructure required up to the Point of Interconnection, complete in all respects, subject to approval of MSETCL/STU and other concerned authorities. at Lower Wardha Dam, Village Dhanodi, Taluka Arvi, District Wardha, Maharashtra, India. Including 10 years of Comprehensive Operation and Maintenance of the Floating Solar PV Plants and associated BESS up to the Point of Interconnection, on EPC basis from eligible prospective Bidders.